In the field of electric power and energy construction engineering, LIMAC's businesses cover EPC, building, installation and construction, investment and construction of new energy projects, overhaul & operation, environment-friendly transformation projects, etc. The company has successively contracted, constructed and completed 67 power units. The projects undertaken in China include the building and installation project of Unit 3# 1*600MW for China Huaneng Hegang Power Plant, installation of Unit 6# 1*600MW unit for China Guodian Corporation Shuangyashan Power Plan, building and installation of 2*600MW unit for Hongkong Baofeng Group Turkey project, 2*300MW unit for Shenhua Group Shendong Electric Power Salaqi Power Plant, etc. The projects undertaken abroad include EPC of 2*660MV project for India Barath Corp., No. 4 combustion engine for 750MW combined cycle power station project in Nigeria, PG9171E combustion engine generator for 150MW combined cycle project of Bangladesh Chandpur Combustion Engine Power Plant, combined cycle power plant project in Al-Nasserieh, Syria as well as many projects under construction in Cuba, Turkey, etc.
In terms of the research and development and manufacture of generating and controller switching equipment and apparatus chambers, LIMAC Corporation has strong capability in scientific research and development and production. LIMAC can carry out manufacture and assembly in accordance with Chinese national standards (GB), standards of International Electrotechnical Commission, Britain Standards, Japanese Industrial Standards, German standards (DIN, VDE), American standards (ANSI), etc., and can provide advanced complete sets of technical equipment and all-round quality service for foreign thermal, water and nuclear energy power plants, substations, mining, metallurgical, petrochemical, electrified railway, urban and rural power grids, high-rise buildings and other sectors. LIMAC has made excellent achievements in power equipment supply. We have been involved in the projects sponsored by the Water and Power Development Authority of Pakistan since 1987. And then, LIMAC has participated in the power transmission and substation transformation project in Zou County, Shandong, the bidding project in Ertan, Sichuan, the bidding project of the Water and Power Development Authority of Pakistan, the bidding project of Indian National Power Corp. and the bidding project of the Water and Power Agency in Malaysia.
Nigeria Papalanto 336MW Gas Turbine Power Station EPC Project
Singapore Keppel Seghers Tuas 1×30MW WTE (Waste-to-energy) Plant EPC Project
Egypt Banha 750MW Gas Turbine Power Station EPC Project
Botswana 4×150MW CFB Power Station EPC Project
Sudan Garri No.1 Power Plant 2×100MW Coal-fired Units EPC Project
Vietnam Cam Pha Power Plant 1×300MW Coal-fired Units EPC Project
Ghana Asogli 2×180MW Units EPC Project
Botswana Mmamabula 2×660MW Power Station EPC Project
Turkey Sirnak 2×135MW CFB Power Station EPC Project
ussia Troitsk 1×660MW Power Station EPC Project
Turkey BEKIRLI Power Station 2# Unit 1×600MW Unit EPC Project
Sudan Garri Combined Cycle Power Station200MW Units EPC Project
Turkey BIGA Power Plant Phase I- II 3×135MW Power Station EPC Project
The project construction
Equipment installation and commissioning
More projects and products |
地址:中國 大連民主廣場3号 ADD:NO.3 MINZHU SQUARE DALIAN CHINA P.C.:116001
TEL:+86-411-82827777 FAX:+86-411-82640668 ICP備案:遼ICP備19019561号-1